 |
|
->
Click on the photo to enlarge it <- |
|
|
|
|
|
|
|
| |
|
|
| |

Bill resting with the block layers
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |

Betty |
|

Getting ready to make the crosses |
|
|
|

The Big Red stopping every 5 minutes |
|
| |

Resting after mixing some concrete
|
|
| |
|
|
|
| |

Cleaning the inside of the building |
|
| |
|
|
|
| |

The block crew |
|
| |
|
|
|
| |

The block crew unloading |
|
| |
|
|
|
| |

Glueing the crosses |
|
|

The cross group |
|
|

Digging the septic tank |
|
|

Drilling holes for the electricity
|
|
| |

Rey talking with the group |
|
|

Painting the side of the church van
(Big Red)
|
|
|

Jerry helping with the electricity
|
|
|

Marking the map
|
|
|

The map of the area around our church created by the group
|
|
|

Nina, Angel and Scott and the septic tank group
|
|
|

Painting the concrete
|
|
|

More painting!
|
|
|

Linda & Chuck working on the septic tank
|
|
|

Three amigos on the roof
|
|
|
|
|

Sanding the crosses
|
|
|
|
|
|
|

The group sifting sand
|
|
|
|
|

Taking a lunch break
|
|
|

Lowering concrete to build the septic tank
|
|
|
|
|
|
|
|
|
|
|
|

The sign group -ready to put it up
|
|
|

Puttiing up the church sign
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

Kelly helping carry concrete bags for the mix
|
|
|

Painting the crosses for Good Friday
|
|
|
|
|
|
|
|
|
|
|

Making the crosses for Good Friday
|
|

Steve, talking to the congregation
|
|
|

Arriving to work, very early!
|
|
|

Our contractor Joe (one in the red) giving words of thanks to theVolunteers
Thank you for all your work!
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

A special song by the MOST Volunteers |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|